The Fiber System provides you with a way to project tract income, production cost, stumpage cost, miscellaneous cost, and gross profit on timber deed tracts
To access the Projected tab, click on the Projected tab.
The Projected list window, will be displayed as follows:
To save and exit the Tract window, press Page Down, click on the OK button, or press “Alt O”. To exit without saving the Tract window, click on the Cancel button, press “Alt C”, press Esc, or click on the “X” in the upper right corner of the screen.
To access online help, click on the Help button, press “Alt H”, or press F1.
Projected Information Maintenance
The products and stumpage rates entered on the Cruise tab default to the Projected tab.
To edit the projected rates on a product, highlight the desired product and click on the Edit button, press “Alt E”, or press Enter.
When you edit the projected rates for a product, the system will display the Projected Information window as follows:
Enter or edit the information on the Projected Information window according to the following specifications:
Projected Destination Rate
Enter the projected composite destination rate per unit for all destinations assigned to the tract for the selected product.
Projected Production Rate
Enter the projected production cost per unit for the selected product.
Projected Stumpage Rate
The projected stumpage rate per unit for the selected product is maintained by the system and defaults from the Cruise tab.
Projected Miscellaneous Expense Rate
Enter the projected miscellaneous expense rate per unit for the selected product.
To save and exit the Projected Information window, press Page Down, click on the OK button, or press “Alt O”. To exit without saving the Projected Information window, click on the Cancel button, press “Alt C”, press Esc, or click on the “X” in the upper right corner of the screen.
To access online help, click on the Help button, press “Alt H”, or press F1.